Mumbai, India
Home About Services Work Blogs Contact
Start A Project

How can a UK startup build a hardware MVP with an India-based studio?

October 2026

To Be Named Labs Studio

The short answer

A UK startup can build a hardware MVP with an India-based studio by scoping a paid discovery, paying against working milestones, owning all source from day one, and designing for UK rules — CE or UKCA marking and PSTI security requirements — from the first schematic. To Be Named Labs, a hardware product studio in Mumbai, works this way with founders outside India.

Building From the UK5 min read

UK hardware founders often run on grant funding, angel rounds or university spin-out budgets. Every pound has to reach a working prototype, not disappear into overhead. An India-based studio can stretch that budget — if the engagement is structured properly and the product is designed for UK rules from the start.

The budget logic

UK engineering rates for industrial design, electronics, firmware and software add up fast across four disciplines. An India-based senior team covering the same scope costs considerably less in engineering hours. Components, fabrication and lab fees cost about the same either way.

For grant-funded projects, that difference matters twice. It stretches the build, and it leaves budget for the things grant reviewers and investors actually want to see: field trials, user validation, and a second hardware revision that fixes what the first one found.

The catch: cheaper hours only help if the work is right first time. Judge a studio on how it thinks about your hardest problem, not on its day rate.

CE or UKCA: what applies in Great Britain

After Brexit, the UK introduced the UKCA mark as a replacement for CE in Great Britain. In 2023, the government reversed course and announced indefinite recognition of the CE mark for a broad set of product regulations, later put into law.

What that means for most connected electronics in practice:

The practical upside: if you design to EU requirements, one technical file can cover the EU and Great Britain. That suits UK startups who plan to sell into Europe anyway.

PSTI: security rules for connected products

The UK's Product Security and Telecommunications Infrastructure regime has applied to consumer connectable products since April 2024. It sets three baseline requirements:

Requirement What it means for your design
No universal default passwords Each device needs a unique password, or the user sets one on setup
A published way to report vulnerabilities You need a vulnerability disclosure policy and a contact point
A stated minimum security update period You must commit to how long the product gets security updates

These shape architecture, not paperwork. Unique credentials need to be generated and programmed at the factory. Security updates need a working, signed over-the-air update pipeline. The support period needs a business plan behind it — someone has to fund updates for the years you promise.

Your studio should design these in from the first firmware milestone. Retrofitting unique credentials after production starts is painful.

IP and contracts

UK founders should expect three things from the contract:

Ask, too, about open-source components in firmware. Licence obligations travel with the product, wherever it gets designed.

Time zones and working rhythm

India runs 4.5 hours ahead of UK time in summer and 5.5 hours ahead in winter. That gives a comfortable overlap: the UK morning matches the Indian afternoon. Daily stand-ups, design reviews and debugging sessions fit inside normal working hours on both sides, without anyone working nights.

What a UK MVP engagement looks like

Phase What happens What you hold at the end
Discovery Requirements, architecture, part selection, risk list, compliance map for UK/EU A plan you can take anywhere
Works-like build Custom PCB, firmware core, bring-up Working boards shipped to the UK
Integrated prototype Enclosure, app, OTA, PSTI-ready credentials 10–30 units for real users
Validation Field trial, fixes, pre-compliance scans Evidence for investors and grant reports
Production prep DFM, manufacturing package, test fixtures A package any factory can quote

Why offline-first matters in UK deployments

Many UK hardware products end up in basements, plant rooms, rural sites and old buildings with thick walls — exactly where connectivity fails. Draper, our offline-capable digital signage platform, keeps playing content locally and syncs when the network returns. The same principle applies to sensors, controllers and kiosks: make every critical decision on the device, and treat the cloud as a place to sync.

Questions founders ask

Do I need UKCA marking for an electronic product in the UK?

For most products covered by the recognised regulations, including radio and electrical equipment, CE marking is accepted in Great Britain and UKCA is optional. Northern Ireland requires CE.

What is PSTI for connected devices?

The UK's security regime for consumer connectable products. It bans universal default passwords, requires a vulnerability reporting route, and requires a stated minimum security update period.

Can grant-funded UK projects use an overseas studio?

Many can, depending on the grant's terms. Check your funder's rules on overseas subcontracting before you sign.

How much time overlap is there between the UK and India?

India is 4.5 to 5.5 hours ahead of the UK, which leaves a comfortable shared window for meetings during normal working hours on both sides.

Tell us what you're building.

Send us the one-line version of your product. We'll come back with a technical read: the hard parts, what to cut for v1, and a realistic path from prototype to field.

Keep reading